SEADRIF, Southeast Asia Disaster Risk Insurance Facility SEADRIF-SAFETechnical design outline, November 2026
SEADRIF-SAFE · Technical design outline

Insuring development partner-financed infrastructure for its whole working life

Cover usually ends when construction does. SAFE keeps it in place.

The SEADRIF Sovereign Asset and Fiscal Empowerment (SAFE) Facility is an ASEAN+3 endorsed regional facility that protects the public services these assets deliver: multi-year cover built into development partner-financed projects, risk engineering from the design stage, and a regional portfolio that brings premiums down.

Read the outline below Download the PDF 8 pages, 2.2 MB
November 2026Championed by the Philippines and Japan as 2026 ASEAN+3 Co-Chairs
PORTSSCHOOLSHOSPITALSBRIDGESROADS

SAFE Insights

Chapter 1

The problem

ASEAN needs more than US$476 billion of annual infrastructure investments from 2026 to 2040 to support the region’s growth. ASEAN countries also bear costly infrastructure losses at an estimated US$12 billion a year from disaster events.

Insurance for public assets is inadequate, piecemeal and chronically underfunded, so disaster losses land on public budgets.

Without insurance, governments pay for reconstruction by diverting development spending, borrowing at short notice or waiting for outside help. When that money is slow to arrive, damaged roads, ports, schools and hospitals stay out of service for longer.

Assets in place today · US$8.9tn Additional new assets, 2026–2040 estimated US$7.1tn potential losses increaseas these are built
US$12bnestimated average annual disaster losses on assets already in place.1
US$476bn+infrastructure investment needed by ASEAN every year, 2026 to 2040.2 Most new assets will be uninsured once built.

Governments already bear a high cost of disaster losses to existing assets. Every year of new, largely uninsured investment adds to what is at risk.

1 SEADRIF estimate. Average annual loss from earthquake, flood and tropical cyclone to buildings and infrastructure, public and private, in Cambodia, Indonesia, Lao PDR, Malaysia, Myanmar, the Philippines, Thailand and Viet Nam. Based on 2020 exposure of about US$8.9 trillion (CDRI Global Infrastructure Risk Model) and loss ratios from Willis Towers Watson (2021), World Bank and GFDRR models. Philippines figure excludes flood. Losses will rise as the asset base grows.

2 Asian Development Bank (ADB), The $7 Trillion Challenge: Building Tomorrow’s ASEAN, ADB Briefs No. 418, November 2026. US$476bn a year over 2026–2040, about US$7.1tn in total.

Three gaps

Financial resilience

Public assets are consistently underinsured

Infrastructure is typically insured during construction, but coverage is usually not taken out once the asset becomes operational and starts to deliver critical public services.

Risk engineering

Public assets miss out on measures to increase physical resilience

Private infrastructure investments routinely employ risk engineering at the project design stage to reduce potential disaster impacts. Public projects often do not, leading to lower resilience and higher insurance premiums.

Market capacity

Local markets lack capacity for public infrastructure risk

Local insurance markets in ASEAN have limited experience and capacity to tailor cover for complex public infrastructure, leaving governments to bear the full cost of damage to infrastructure following disasters.

Why this situation persists

A handful of sovereign insurance programmes exist, but they are limited in scope and duration. For public infrastructure, most countries rely on short-term cover or ad hoc arrangements, leaving large gaps in protection.

Insurance is seen as a cost

Insurance is treated as an expense, not an investment in protection.

Dependence on annual budget appropriations

Securing cover depends on annual budget appropriations for insurance premiums, which policy changes and political cycles can interrupt.

Procurement rules

Public procurement rules are often poorly suited to insurance, which slows contracting.

Costs are too high

Countries negotiating individually with commercial markets face weak bargaining power, leading to high premiums and often unsuitable products.

Chapter 2

What SAFE does

SAFE aims to keep development partner-financed public infrastructure insured for its whole working life, through multi-year cover built into project financing, risk engineering from the design stage and a regional portfolio that lowers premiums. It is a dedicated SEADRIF programme, championed by the Philippines and Japan as 2026 ASEAN+3 Co-Chairs.

  • Multi-year insurance for government infrastructure assets
  • Parametric and/or indemnity products chosen to fit each project's needs and demand
  • A minimum standard of cover while new public assets are built, where this adds value
  • Premiums embedded directly in development partner-financed projects, so cover no longer depends on annual budget appropriations
  • A regional portfolio, providing better pricing and centralised expertise
  • Risk engineering required from the start of project design
  • Development of local insurance markets

Where protection usually stops, and how SAFE keeps it in place

Swipe sideways to see the full lifecycle.

In place Gap

Chapter 3

Benefits

SAFE will reinforce financial protection and resilience of public infrastructure assets in ASEAN countries.

More resilient assets through risk engineering

Risk engineering is the assessment of how an asset could be damaged by floods, storms, earthquakes and other hazards, and the design, construction and maintenance measures that reduce that damage.

Bringing (re)insurers’ risk-reduction expertise into projects at the design stage, rather than after completion, embeds best practice in every public infrastructure investment. Stronger design standards and loss-prevention measures align with the Sendai Framework for Disaster Risk Reduction by reducing risk and strengthening preparedness.

Multi-year insurance cover protects economic outcomes

Today, if public assets are insured at all, cover is arranged on an annual basis. Each renewal needs a fresh budget appropriation and a new procurement, and cover lapses when either is delayed by policy changes or political cycles.

SAFE arranges cover for several years at the outset, financed through the project, so the asset stays protected through its operational life without annual procurement. When a disaster strikes, funds to repair the asset and restore its services are already in place, and governments do not need to divert development spending.

Embedded premiums in project financing save costs and remove the need for annual budget appropriations

Analysis shows potential premium savings of over 10% on a present-value basis if financed through a development project with a concessional borrowing rate.

>10%potential premium saving, present-value basis

Aggregating and pooling through a regional facility reduces premiums

Economies of scale and regional diversification can achieve premium reductions of over 25% compared with stand-alone arrangements, supported by full transparency in pricing and competitive reinsurance placement.

>25%potential reduction against stand-alone arrangements

Mobilising private risk capital and deepening domestic insurance markets

De-risking of investments at scale creates a new market for public-asset risk, crowds in billions of private risk capital, and strengthens domestic markets through participation.

A city skyline on a river at dusk
Chapter 4

What US$100 million of concessional capital could unlock

Concessional capital makes public infrastructure cover affordable and builds the market. Indicative analysis of a conceptual product structure and portfolio of policies shows what is achievable.

A capitalised facility to unlock cover

US$100 million of concessional capital, taking the first layer of risk, could unlock US$6.9 billion of annual cover across eight ASEAN economies, with two reinstatements, so cover can be restored twice after claims in a year.

US$100mCapital
US$6.9bnAnnual cover
US$156bnof public assets covered, about 11% of the estimated stock of public assets in ASEAN
Up to US$600mestimated payout in a severe disaster year (probable maximum loss)

Savings that exceed the capital in under three years

With the capital fully deployed, premium savings of about US$39 million a year, roughly 40% of the capital, would exceed the US$100 million invested in about two and a half years. The capital is not spent to generate these savings: it is held as risk capacity and keeps producing them year after year. If less of the capital is deployed, savings are proportionately lower.

Simple payback at a constant US$39 million a year, assuming full deployment of the capital, as in the outline.

Cumulative premium savings assuming full capital deployment
US$ million

How concessional capital builds the market and reduces premiums

SAFE's concessional capital absorbs an initial layer of risk, which lowers premiums for countries and crowds in commercial cover above it, including local insurers.

Commercial coverInternational reinsurers and local insurers, priced more efficiently above SAFE's layer
SAFE FacilityAbsorbs the initial layer of risk
  • Lower premiums for countries
  • Private risk capital crowded in above the first layer
  • Domestic markets built through local participation
  • A new market for public-asset risk
Chapter 5

Next steps

SEADRIF and the SAFE Task Force seek continued support and concrete commitments from ASEAN+3 members and development partners to reach SAFE's targeted launch in May 2027.

May 2027targeted operational launch at the ASEAN+3 Finance Ministers' and Central Bank Governors' Meeting

From endorsement to launch

Since SEADRIF members endorsed SAFE in October 2025, it has moved through SEADRIF and ASEAN+3 governance, with a Task Force of development partners shaping its technical design. SAFE’s targeted operational launch is in May 2027.

Latest milestoneTarget launch
  1. SEADRIF members endorse the SAFE concept at the 8th SEADRIF Technical Meeting, led by the Philippines and Japan as ASEAN+3 co-chairs.

  2. SEADRIF members agree on the SAFE Task Force workplan at the 9th Technical Meeting and reaffirm SAFE as a priority workstream.

  3. ASEAN+3 Finance Ministers and Central Bank Governors (AFMGM+3) welcome SAFE and endorse the timeline towards a formal launch in May 2027.

  4. The SAFE Task Force is established with the Asian Development Bank, the Asian Infrastructure Investment Bank, the Japan International Cooperation Agency, the Monetary Authority of Singapore and the World Bank to lead the technical design.

  5. The SAFE Technical Design is developed through Task Force meetings and bilateral consultations with development partners.

  6. An in-person technical roundtable in Singapore gathers feedback on the design from Task Force members and government officials.

  7. The SAFE Technical Design Outline is presented at the 10th SEADRIF Technical Meeting, a High-level Roundtable at the margins of the World Bank/IMF Annual Meetings, and the ASEAN+3 Finance and Central Bank Deputies’ Meeting (AFCDM+3) for feedback.

Next steps

1

ASEAN+3 members and development partners to provide guidance on the SAFE technical design

The full technical design will be circulated in December 2026 for feedback.

2

Identification of additional pilot projects

For early implementation, building on those already identified.

3

Sustain senior-level political momentum

Continue engagement through the SAFE Task Force to support SAFE’s target operational launch at the ASEAN+3 Finance Ministers’ and Central Bank Governors’ Meeting (AFMGM+3) in May 2027.

4

Mobilise capital

Consider pathways for capital contributions, including concessional and catalytic sources, ahead of the target May 2027 launch.